KVOE AM 1400 logoCountry 101.7 logoMix 104.9 logo

Fair
Emporia, KS
73
°F

Fair
Humidity: 64 %
Wind : SE at 7 mph

<div style="background-color: #72bcdb;"><a title="rsspump" href="http://news.rsspump.com/">news</a></div>

Bridge work begins on K-99 near Madison

Work is underway on a bridge repair near Madison.

KDOT is repairing an expansion joint at the south end of a bridge on Kansas Highway 99 about a mile north of the K-58 junction outside Madison. Workers are also placing a polymer on both ends of the bridge as a sealant.

Work could be done by Halloween, weather permitting. Traffic is down to one lane during the construction period, and flaggers are guiding traffic through the work zone.

See what is happening with KVOE